Progress Check
The cabinet is 90% finished. As soon as I get my new high-lip trackball I can wire up the control panel and move my focus to the software configuration, artwork, and LED-lit bling.
.
The cabinet is 90% finished. As soon as I get my new high-lip trackball I can wire up the control panel and move my focus to the software configuration, artwork, and LED-lit bling.
.
It was a gorgeous day out so I made did some more work finally. First up, the speaker grill. I made it out of 1/2″ MDF that is held on with really powerful rare earth magnets.
First I screwed in some temporary router guides and cut the speaker holes, then I rounded it over and spray painted it black. I held the frame in position and drilled four small pilot holes to be guides for drilling the retainer magnet holes. The magnets were epoxied into holes that were already a snug fit. I stretched the grille cloth over and secured with staples and hobby glue. Everything came out great:
I uesd my tablesaw to dado out an angled groove in a block of wood to support the tinted safety glass in front of the monitor. I then used glue and pocket hole screws to fasten the block to the inside of the control panel. This block will not be visible as the control panel will be angled and close over it flush against the glass.
I have redone the speaker panel and monitor mount, I am much happier with them now. I ordered a piece of smoked tempered glass today, and will be spray-painting a ‘bezel’ on the back of it. I also hope to cut the marquee plexi this weekend.
Temporary router guides to cut the monitor opening:

The back of the monitor bracket prior to drilling:

I added this hunk of wood to make it easier to move around with a dolly.

The ’secondary speakers’ to be used with the Ambiance App.
55 degrees was perfect to get some more work done. First, the way I had the rear vinyl stapled to hold it down looked terrible so I used some hardwood to fix it up,
Then I whipped up a template to use in routing out an opening for the DVD-ROM. I used my Kreg Pocket Hole Jig.. worked great. . Worked nicely IMHO.
I needed to beef up the MDF Shelves so that I could glue and screw the front panels to it. I did this by gluing and screwing oak boards onto the shelves.
You will note above I used a few angled pieces on the Keyboard Drawer to form a ‘drawer pull.’
Ad the end of the day, this is where I am:
To do next:
1) Stiffen up the roll-out box. It is wobbly right now.
2) After cutting the hole for the coin door I will be laminating the drawer faces. I will probably put t-molding on the edges of both, we will see.
3) create a monitor mounting system
4) create a system for mounting the tinted safety glass
I am saving building the Control Panel for last. I want to give it a LOT of thought.
I did a few things today… first I installed the T-molding. Here’s the slot bit mounted in the router ready to go..
The slot is cut:
The T-molding is ready to go:
Installing it:
Shaving off the extra t-molding Material:
It was a tad cold for it, but I took a chance and applied the laminate sides to the cabinet today. Everything went great, and I also managed to create the speaker ‘panel.’ It will have a cloth covered grille over it so I wasn’t super fussy about the holes..
I know most people route the T-molding slot earlier in the process, but I tend to bang into the edges and mess up the slot so I do it later in the process.
Between the holidays and the colder-than-normal winter, I haven’t been able to do any work. To make matters worse, “Punxsutawney Pete” claims it’ll go another six weeks, so I expect to resume work in March/April at this point.